{"artifact_type":"structured_extraction_not_original_file","checked_at":"2026-10-25","fiscal_year":2000,"document_year":2000,"source_document_year":2000,"document_date":"2000-12-14","municipality":"충청북도 옥천군","province_at_source":"충청북도","province_current_reference":"충청북도","source_urls":["https://council.oc.go.kr/viewer/minutes/13720.do"],"source_version":"Round370 2026-10-25 옥천군 FY2000 군비 재해위험시설 예방정비15개소 사업비 보고액1행; 군비직접확인·물리완료보고/실제지급구분·1042/42범위차이보존·회계/의결/결산미확인.","source_location":"옥천군의회 제98회 제2차 정례회 본회의 제5차(2000-12-14), HTML L111 회의일, L366–368 건설과장 유재호 답변, L384–386 재해위험요소 해소대책 중 금년 군비15개소1차2억원 투자·상반기사업완료 보고. L385 위험시설1,042개소와21+21개소 분류 및 계획16억8,400만원, L386 내년14개소1억9,000만원, L389 별도국도비사업과 구분. HTML 자체 PDF·인쇄쪽수 미제공·직접판독 미확인.","verified_amounts":[{"record_id":"OKCHEON-2000-COUNTY-FUNDED-URGENT-DISASTER-RISK-FACILITY-IMPROVEMENT-REPORTED-PROJECT-AMOUNT","municipality":"옥천군","fiscal_year":2000,"stage":"FY2000 군비 재해위험시설 긴급예방정비15개소 사업비 보고액(상반기 사업완료 보고; 예산편성·의결·실제지급·결산 미확인)","item":"군비 재해위험시설 긴급예방정비15개소 사업비 보고액","source_value":2,"source_unit":"억원","amount_krw":200000000,"source_url":"https://council.oc.go.kr/viewer/minutes/13720.do","location":"옥천군의회 제98회 제2차 정례회 본회의 제5차(2000-12-14), HTML L111 회의일, L366–368 건설과장 유재호 답변, L384–386 재해위험요소 해소대책 중 금년 군비15개소1차2억원 투자·상반기사업완료 보고. L385 위험시설1,042개소와21+21개소 분류 및 계획16억8,400만원, L386 내년14개소1억9,000만원, L389 별도국도비사업과 구분. HTML 자체 PDF·인쇄쪽수 미제공·직접판독 미확인.","note":"옥천군의회2000년12월14일 군정질문 답변에서 건설과가 금년에 정비가 시급한 재해위험시설15개소에 군비로1차2억원(200,000,000원)을 투자하여 상반기에 사업을 완료했다고 보고한 금액1행을 확인했다. 회의일과 금년이라는 진술로 대상FY2000을 구분한다. 실제 지급원장·지출액·결산이나 최종 예산의결액을 확인한 것은 아니다. 선택사업은 재해위험요소인 수해상습지의 시급한 시설을 개량·정비하는 예방사업 문맥이다. 실제 수해피해 복구금액으로 바꾸지 않는다. 사업완료는 건설과장의 물리적 진행상태 보고로 한정하며 금액 전액의 지급·준공검사·결산 승인이나 예방효과를 증명하지 않는다. 1차는 사업단계 표현이며 제1회 추경 등 예산편성 회차로 바꾸지 않는다. 답변자는 건설과장 유재호이며 부서 건설과는 직접 확인했다. 군비라는 재원 진술은 선택15개소2억원과 직접 연결되어 군비 보고액200,000,000원으로 기록한다. 군비를 일반회계로 자동 등치하지 않고 회계·기금은 결측이다. 국비·도비·자부담·기타재원은 명시되지 않아0으로 만들지 않는다. 뒤에 나오는 다른 국도비 지원사업을 선택사업의 재원으로 옮기지 않는다. 원문2억원을2×100,000,000=200,000,000원으로 환산하고 원문의 억원 표시 정밀도를 보존했다. 정비15개소를 합친 보고액으로 개소별 명칭·배분액은 확인하지 못했으므로 균등 분할하거나 개소당 단가를 만들지 않는다. 보고액200,000,000원과 같은 군비 구성 진술만 확인했으며 전체 회계수지나 현금흐름 검산은 미확인이다. 앞 문장은 지난해 조사로 확정한 위험시설1,042개소라고 하면서 시설별 분류는 미정비 소하천·세천21개소와 소교량·배수관·하수구 등 소규모시설21개소를 열거한다. 분류합42개소와 총계 표기1,042개소의 차이1,000개소는 범위·원인 미확인으로 보존한다. 임의로42개소로 정정하거나1,042개소·42개소를 선택15개소의 완료율 분모로 쓰지 않는다. 같은 문맥의 약16억8,400만원은 위험시설 개량 추진계획 규모이며 선택사업의 실제 총액이나 집행액으로 합치지 않는다. 지난해 조사를FY1999 재정금액으로 바꾸지 않는다. 내년14개소1억9,000만원은FY2001 향후계획으로 선택FY2000 금액과 구분하고 이번에는 추가 행으로 만들지 않는다. 별도 금구천·안내천·증약소하천 등 국도비사업도 선택15개소 군비사업과 중복 합산·상계하지 않는다. 정확한 회계·기금·편성회차·확정예산액·실제 지급·결산·준공검사·전체수지와 잔차는 미확인이다. 특정 재난명·태풍명·피해 발생일·개인귀속·10세 전 빈곤/재난경험·공약·인과효과도 확인하지 못했다. 공식HTML 위치를 제공하며 PDF·인쇄쪽수나 원본 첨부파일을 직접 읽었다고 표시하지 않는다. 공식 회의록1건을 새로 직접 읽어 사업비 보고액1행을 추가했다. 신규 공식문서1건·신규 보관 원본파일0건이다. 구조화JSON과 화면표는 원본파일이 아니다. 기존 재해대책·재난관리기금 계획2행과 다른 사업비 보고액이며 금액을 합산하지 않는다. 기존 원자료·인물·재정자료·연도별 원본19개·공동기록을 보존한다.","national_funding":null,"childhood_disaster":null,"province":"충청북도","report_fiscal_year":2000,"verification_date":"2026-10-25","summable_flag":false,"causal_ready":false,"analysis_status":"verified_county_funded_disaster_risk_facility_reported_project_amount_not_confirmed_actual_payment_budget_stage_settlement_or_effect","municipality_key_provisional":"충청북도|옥천군","raw_stage":"군정질문답변/재해위험요소 해소대책/군비금년15개소1차2억원투자·상반기사업완료보고","stage_class":"project_amount_report","id":"OKCHEON-2000-COUNTY-FUNDED-URGENT-DISASTER-RISK-FACILITY-IMPROVEMENT-REPORTED-PROJECT-AMOUNT","government_level":"기초자치단체","year":2000,"value_year":2000,"account":null,"metric":"county_funded_urgent_disaster_risk_facility_improvement_reported_project_amount","unit":"원","source_title":"옥천군의회 제98회 제2차 정례회 본회의 제5차 회의록(2000-12-14)","source_institution":"옥천군의회","pdf_page":null,"printed_page":null,"funding_source":"군비(선택사업 재원 보고; 실제지급·결산 미확인)","central_support_flag":null,"council_final_approval_flag":null,"head_person_id":null,"hierarchy":"selected_county_funded_risk_facility_improvement_report","parent_group":"okcheon-2000-county-funded-urgent-disaster-risk-facility-improvement-reported-project-amount","measure_type":"reported_project_amount","additivity":"선택15개소군비200000000원보고액1행.군비는동일액의재원진술/추가행아님.위험시설계획1684m·미래190m·국도비별도사업·기존기금계획/결산과합산금지.국도비/회계/실제지급null.","leader_name":null,"document_date":"2000-12-14","funding":null,"council_approval_flag":null,"expenditure_krw":null,"disaster_specificity":null,"verification":"official_body_direct_read_and_independent_re_read_ledger_check","childhood_disaster_under10":null,"amount":200000000,"municipality_level":"기초자치단체(군)","fund":null,"record_type":"project_amount_report","parent_item":null,"source_document":"FY2000 군정질문답변 건설과 재해위험시설 긴급예방정비15개소 군비사업비 보고","verification_note":null,"analysis_note":null,"source_url_status":null,"source_url_note":null,"source_page_number":null,"source_document_stage":"FY2000 군비 재해위험시설 긴급예방정비15개소 사업비 보고액(상반기 사업완료 보고; 예산편성·의결·실제지급·결산 미확인)","source_unit_note":"2억원=200000000원","source_page_url":"https://council.oc.go.kr/viewer/minutes/13720.do","source_snapshot_sha256":null,"source_review_count":1,"previous_source_value":null,"change_source_value":null,"committee_approval_date":null,"source_format":"official_council_HTML_direct_read; original_file_not_retained","source_publication_date":null,"source_value_text":"2억원","reference_document_page_reported":null,"source_section":"건설과장 군정질문답변/재해위험요소해소대책/군비금년시급15개소1차정비","source_review_method":"공식본문독립직독·회의일/금년FY2000·건설과/군비직접연결·억원환산·보고액/상반기물리완료/지급분리·1차를추경미추론·1042/42범위차이보존·회계/국도비/의결/집행결산/전체수지null","provincial_funding_krw":null,"municipal_funding_krw":200000000,"source_data_as_of":null,"reported_as_of":null,"individual_transaction_date":null,"cross_year_program_flag":null,"source_discrepancy_flag":null,"source_discrepancy_note":null,"source_report_date":"2000-12-14","source_event_date":null,"parent_record_id":null,"source_date_note":"회의2000-12-14와금년진술로FY2000선택.지난해조사는FY1999금액아님·내년14개소190m는FY2001계획으로구분/이번추가행0.상반기완료보고는실제지급/결산확인아님.","case_id":null,"council_approval_date":null,"council_approval_source_url":null,"council_approval_minutes_url":null,"council_approval_reference":null,"council_stage_note":null,"approval_date":null,"approval_result":null,"approval_source_url":null,"approval_url":null,"approval_location":null,"approval_scope":null,"approval_event_scope":null,"approval_note":null,"approval_verification_date":null,"council_adjustment_krw":null,"council_final_amount_krw":null,"national_funding_krw":null,"source_precision":"reported_to_100_million_krw","secondary_pdf_page":null,"secondary_printed_page":null,"bill_source_url":null,"carryover_amount_krw":null,"carryover_source_display":null,"subsidy_return_krw":null,"budget_balance_krw":null,"component_parent":null,"disaster_business_expenditure_flag":null,"previous_year_carryover_krw":null,"review_status":"selected_county_funded_prevention_project_report_verified; physical_completion_report_not_actual_expenditure_settlement_or_effect","approved_for_integration":true,"source_rendered_page_url":null,"balance_scope":null,"balance_residual_krw":null,"fund_plan_total_income_krw":null,"fund_plan_total_expenditure_krw":null,"fund_plan_opening_balance_krw":null,"fund_plan_closing_balance_krw":null,"source_total_pages":null,"headpersonid":null,"leader_id":null,"leader_attribution":null,"attribution_status":"not_directly_attributed_to_person","scope":"군비 재해위험시설 긴급예방정비15개소 FY2000 사업비 보고액","disaster_exclusive_flag":true,"reserve_decision_krw":null,"reserve_actual_expenditure_krw":null,"reserve_unused_balance_krw":null,"reserve_carryover_krw":null,"carryover_verified_zero":null,"amount_thousand_krw":200000,"reported_document_page":null,"funding_receipt_year":null,"province_at_source":"충청북도","province_normalization_note":null,"approval_source_title":null,"final_approved_amount_krw":null,"approval_verification_method":null,"source_secondary_url":null,"source_location":"옥천군의회 제98회 제2차 정례회 본회의 제5차(2000-12-14), HTML L111 회의일, L366–368 건설과장 유재호 답변, L384–386 재해위험요소 해소대책 중 금년 군비15개소1차2억원 투자·상반기사업완료 보고. L385 위험시설1,042개소와21+21개소 분류 및 계획16억8,400만원, L386 내년14개소1억9,000만원, L389 별도국도비사업과 구분. HTML 자체 PDF·인쇄쪽수 미제공·직접판독 미확인.","plan_period_end":null,"council_final_approval_date":null,"council_final_approval_status":null,"final_approval_source_url":null,"final_approval_source_location":null,"final_approval_source_sha256":null,"cross_precision_amount_krw":null,"cross_precision_source_unit":null,"cross_precision_source_value":null,"cross_precision_source_location":null,"source_quoted_page":null,"decision_amount_krw":null,"actual_expenditure_krw":null,"carryover_krw":null,"unspent_balance_krw":null,"budget_current_amount_krw":null,"budget_execution_rate":null,"decision_based_spending_ratio":null,"decision_based_spending_ratio_pct":null,"derived_metric_status":null,"derived_metric_denominator":null,"matched_measure_group":"okcheon-2000-county-funded-urgent-disaster-risk-facility-improvement-reported-project-amount","matched_measure_scope":"FY2000 군비 시급재해위험시설15개소1차정비 보고액1행; 상반기물리완료보고/지급미확인·국도비별도사업/장래계획과구분","source_item_count":1,"opening_balance_krw":null,"balance_exact_match":null,"secondary_source_url":null,"secondary_source_location":null,"source_inspection_period":null,"fund_use_krw":null,"department":"건설과","baseline_appropriation_before_supplement_krw":null,"executive_supplement_adjustment_krw":null,"supplemental_proposal_amount_krw":null,"settlement_amount_krw":null,"national_funding_adjustment_krw":null,"funding_split_status":"selected_county_funding_directly_reported; account_and_national_provincial_other_sources_unknown","budget_reconciliation":"군비로선택15개소2억원투자보고만직접확인.다른재원별구성·전체수지·현금흐름미확인.1042vs21+21=42개소는범위차이원인미확인/완료율금지.","budget_reconciliation_residual_krw":null,"approval_source_location":null,"deduplication_result":"new_round370_Okcheon_FY2000_county_funded_urgent_risk_facility_report; existing1550_preserved; new_official_document1","policy":null,"program":null,"funding_reconciliation_residual_krw":null,"source_document_date":"2000-12-14","formation_krw":null,"closing_balance_krw":null,"department_verification":null,"period_start":null,"period_end":null,"source_meeting_date":"2000-12-14","unit_program":null,"budget_category":"재해위험시설 긴급예방정비15개소 사업비 보고","source_previous_budget_thousand_krw":null,"source_change_thousand_krw":null,"funding_sum_krw":null,"funding_residual_krw":null,"source_unit_multiplier":100000000,"source_pdf_page":null,"approval_secondary_source_url":null,"approval_scope_note":null,"source_date":null,"source_page_status":"official_HTML_locator_only; attachment_PDF_printed_page_not_directly_verified","source_lines":null,"funding_note":"L386군비로금년15개소2억원투자보고직접연결.군비200000000원보고이며실제지급/교부·회계·국도비/기타재원미확인;군비를일반회계로추론하거나국도비0부여금지.","summable":false,"council_approval_result":null,"committee_review_date":null,"assessed_revenue_krw":null,"interest_revenue_krw":null,"explicit_subsidy_total_krw":null,"verified_zero_fields":null,"other_expenditure_krw":null,"non_other_use_components_krw":null,"planned_expenditure_krw":null,"borrowing_krw":null,"other_revenue_krw":null,"formation_reconciliation_residual_krw":null,"operating_expense_krw":null,"materials_expense_krw":null,"facility_expense_krw":null,"facility_incidental_expense_krw":null,"use_component_reconciliation_residual_krw":null,"integrated_financial_stabilization_fund_deposit_krw":null,"total_fund_size_krw":null,"total_fund_size_reconciliation_residual_krw":null,"appropriated_amount_krw":null,"transfer_revenue_krw":null,"deposit_recovery_krw":null,"crosscheck_source_url":null,"use_components":null,"net_change_krw":null,"net_change_residual_krw":null,"council_source_url":null,"general_deposit_krw":null,"mandatory_deposit_krw":null,"deposit_component_sum_residual_krw":null,"source_secondary_title":null,"proposal_submission_date":null,"committee_approval_flag":null,"committee_adjustment_krw":null,"fund_use_plan_krw":null,"deposit_plan_krw":null,"executed_amount_krw":null,"income_krw":null,"planned_income_krw":null,"income_component_reconciliation_residual_krw":null,"amount_stage":null,"physical_page":null,"printed_detail_pages":null,"committee_approval_result":null,"income_components_sum_krw":null,"expenditure_components_sum_krw":null,"income_component_reconciliation_residual_against_raw_total_krw":null,"source_discrepancy_scope":null,"source_http_status":null,"source_download_bytes":null,"source_download_sha256":null,"drone_excluded":true,"source_pdf_sha256":null,"head_person_name":null,"head_tenure_record_id":null,"head_linkage_status":"not_person_attributed","source_archive_sha256":null,"later_revision_stage":null,"later_revision_total_krw":null,"later_revision_delta_krw":null,"later_revision_source_url":null,"source_file_sha256":null,"rounding_residual_krw":null,"rounding_note":null,"inspection_period":null,"budget_proposal_amount_krw":null,"funding_detail":null,"rounding_status":null,"source_sha256":null,"council_adjusted_amount_krw":null,"settled_amount_krw":null,"prior_year_amount_krw":null,"increase_amount_krw":null,"arithmetic_residual_krw":null,"disaster_scope":null,"funding_amounts_krw":null,"funding_total_krw":null,"adjustment_source_url":null,"adjustment_source_title":null,"adjustment_source_location":null,"adjustment_source_sha256":null,"adjustment_list_scope":null,"adjustment_list_page_range":null,"adjustment_list_completeness_verified":null,"adjustment_list_hit_count":null,"adjustment_inference_method":null,"council_adjustment_status":null,"council_adjustment_inference_flag":null,"council_adjustment_directly_observed":null,"council_adjustment_delta_krw":null,"council_adjustment_delta_inferred_krw":null,"budget_proposal_amount_inferred_krw":null,"proposal_final_equality_inferred":null,"adjustment_inference_note":null,"ratio_percent_source":null,"general_account_expenditure_total_krw":null,"ratio_percent_recalculated":null,"source_unit_basis":"2*100000000=200000000원","explicit_zero_source_text":null,"budget_section":null,"fund_type_original":null,"historical_legal_basis":null,"historical_legal_basis_url":null,"later_classification_bridge":null,"later_classification_bridge_url":null,"source_version":"Round370 2026-10-25 옥천군 FY2000 군비 재해위험시설 예방정비15개소 사업비 보고액1행; 군비직접확인·물리완료보고/실제지급구분·1042/42범위차이보존·회계/의결/결산미확인.","source_discovery_status":"new_official_council_HTML_directly_read","source_download_status":"original_file_not_retained","source_original_verification_status":"FY2000_county_funded_urgent_risk_facility_improvement_report_directly_read","source_extraction_status":"one_selected_county_funded_15_site_reported_project_amount; physical_completion_report_not_payment","source_publication_status":"included_in_round370_release","causal_effect":null,"source_discovery_url":"https://council.oc.go.kr/viewer/minutes/13720.do","document_submitted_date":null,"source_local_copy":null,"fund_operation_plan_approved_amount_krw":null,"original_amount_text":null,"source_raw_unit":"억원(한글 금액 표기)","source_attachment_download_status":null,"appendix_header_page":null,"reference_period":null,"expenditure_component_reconciliation_residual_krw":null,"cross_validation_source_url":null,"source_provider":"옥천군의회 공식 회의록","committee_approved_plan_amount_krw":null,"source_report_precision":"억원 표시 정밀도 보존"}],"original_file_retained":false,"downloaded_original_files":0,"new_official_documents":1,"official_documents_revisited":0,"retained_originals":[],"new_source_register_index":418,"source_register_added_record_ids":["OKCHEON-2000-COUNTY-FUNDED-URGENT-DISASTER-RISK-FACILITY-IMPROVEMENT-REPORTED-PROJECT-AMOUNT"],"unit_conversion_check":"2*100000000=200000000원","source_precision_krw":100000000,"selected_reported_project_amount_krw":200000000,"account":null,"fund":null,"department":"건설과","department_basis":"L366–368 건설과장 유재호 답변·L384–386 재해위험요소해소대책","source_presenter":{"role":"건설과장","name":"유재호","context":"L366–368·L384–386"},"fiscal_year_basis":"L111회의2000-12-14와L386금년진술","selected_measure":"FY2000군비시급재해위험시설15개소1차정비사업비보고액","reported_funding":{"municipal_krw":200000000,"national_krw":null,"provincial_krw":null,"other_krw":null,"own_burden_krw":null,"location":"L386 군비로금년15개소2억원투자보고"},"county_funding_is_not_account_identification":true,"unreported_national_provincial_funding_is_not_zero":true,"funding_components_added_as_finance_rows":false,"selected_site_count":15,"individual_site_names":null,"individual_site_amounts_krw":null,"per_site_amount_calculated":false,"reported_physical_completion":{"location":"L386","period":"FY2000상반기","status":"사업완료보고","independent_completion_inspection_verified":null,"actual_payment_verified":null,"settlement_verified":null},"first_phase_is_not_first_supplementary_budget":true,"facility_count_context":{"location":"L385","survey_period":"지난해(회의2000년 기준1999년)","reported_total_sites":1042,"reported_category_site_counts":[21,21],"reported_categories_sum":42,"reported_total_minus_listed_categories":1000,"scope_or_difference_cause":null,"total_corrected":false,"used_as_completion_rate_denominator":false},"broader_plan_context":{"location":"L385","raw_amount":"약16억8,400만원","reported_planned_amount_krw":1684000000,"scope":"위험시설개량추진계획","precise_fiscal_allocation_verified":null,"added_as_finance_rows":false,"prior_survey_year_is_not_finance_year":true},"following_year_plan_context":{"location":"L386","fiscal_year":2001,"site_counts":[12,2],"total_site_count":14,"reported_planned_amount_krw":190000000,"added_as_finance_rows":false},"other_national_provincial_projects_context":{"location":"L389","selected_item_funding_attribution_verified":null,"added_as_finance_rows":false},"disaster_scope_basis":"L384–388재해위험요소/수해상습지해소·예방정비직접문맥","prevention_improvement_not_proven_damage_recovery":true,"specific_typhoon_verified":null,"specific_disaster_name_verified":null,"specific_disaster_date_verified":null,"exact_budget_stage_verified":null,"approved_budget_amount_krw":null,"actual_grant_verified":null,"actual_expenditure_verified":null,"selected_expenditure_printed_page":null,"selected_expenditure_pdf_page":null,"reference_document_page_reported":null,"partial_composition_reconciliation":{"status":"same_selected_amount_county_funding_directly_reported; no_multi_source_component_sum_verified","reported_county_funding_krw":200000000,"selected_reported_amount_krw":200000000,"parent_and_other_components_added_as_finance_rows":false},"balance_reconciliation":{"status":"full_balance_and_cashflow_not_verified","settled_residual_krw":null,"full_budget_balance_verified":false},"committee_item_approval_verified":null,"final_council_item_approval_verified":null,"settlement_final_approval_verified":null,"verified_tenure_context":null,"personal_experience_and_pledge":{"childhood_poverty_under10":null,"childhood_disaster_under10":null,"related_pledge":null},"limitations":"옥천군의회2000년12월14일 군정질문 답변에서 건설과가 금년에 정비가 시급한 재해위험시설15개소에 군비로1차2억원(200,000,000원)을 투자하여 상반기에 사업을 완료했다고 보고한 금액1행을 확인했다. 회의일과 금년이라는 진술로 대상FY2000을 구분한다. 실제 지급원장·지출액·결산이나 최종 예산의결액을 확인한 것은 아니다. 선택사업은 재해위험요소인 수해상습지의 시급한 시설을 개량·정비하는 예방사업 문맥이다. 실제 수해피해 복구금액으로 바꾸지 않는다. 사업완료는 건설과장의 물리적 진행상태 보고로 한정하며 금액 전액의 지급·준공검사·결산 승인이나 예방효과를 증명하지 않는다. 1차는 사업단계 표현이며 제1회 추경 등 예산편성 회차로 바꾸지 않는다. 답변자는 건설과장 유재호이며 부서 건설과는 직접 확인했다. 군비라는 재원 진술은 선택15개소2억원과 직접 연결되어 군비 보고액200,000,000원으로 기록한다. 군비를 일반회계로 자동 등치하지 않고 회계·기금은 결측이다. 국비·도비·자부담·기타재원은 명시되지 않아0으로 만들지 않는다. 뒤에 나오는 다른 국도비 지원사업을 선택사업의 재원으로 옮기지 않는다. 원문2억원을2×100,000,000=200,000,000원으로 환산하고 원문의 억원 표시 정밀도를 보존했다. 정비15개소를 합친 보고액으로 개소별 명칭·배분액은 확인하지 못했으므로 균등 분할하거나 개소당 단가를 만들지 않는다. 보고액200,000,000원과 같은 군비 구성 진술만 확인했으며 전체 회계수지나 현금흐름 검산은 미확인이다. 앞 문장은 지난해 조사로 확정한 위험시설1,042개소라고 하면서 시설별 분류는 미정비 소하천·세천21개소와 소교량·배수관·하수구 등 소규모시설21개소를 열거한다. 분류합42개소와 총계 표기1,042개소의 차이1,000개소는 범위·원인 미확인으로 보존한다. 임의로42개소로 정정하거나1,042개소·42개소를 선택15개소의 완료율 분모로 쓰지 않는다. 같은 문맥의 약16억8,400만원은 위험시설 개량 추진계획 규모이며 선택사업의 실제 총액이나 집행액으로 합치지 않는다. 지난해 조사를FY1999 재정금액으로 바꾸지 않는다. 내년14개소1억9,000만원은FY2001 향후계획으로 선택FY2000 금액과 구분하고 이번에는 추가 행으로 만들지 않는다. 별도 금구천·안내천·증약소하천 등 국도비사업도 선택15개소 군비사업과 중복 합산·상계하지 않는다. 정확한 회계·기금·편성회차·확정예산액·실제 지급·결산·준공검사·전체수지와 잔차는 미확인이다. 특정 재난명·태풍명·피해 발생일·개인귀속·10세 전 빈곤/재난경험·공약·인과효과도 확인하지 못했다. 공식HTML 위치를 제공하며 PDF·인쇄쪽수나 원본 첨부파일을 직접 읽었다고 표시하지 않는다. 공식 회의록1건을 새로 직접 읽어 사업비 보고액1행을 추가했다. 신규 공식문서1건·신규 보관 원본파일0건이다. 구조화JSON과 화면표는 원본파일이 아니다. 기존 재해대책·재난관리기금 계획2행과 다른 사업비 보고액이며 금액을 합산하지 않는다. 기존 원자료·인물·재정자료·연도별 원본19개·공동기록을 보존한다."}
